Verification · Prototype
Three captures to a working deployment
Most deployments of asset technology begin with an integration. The customer's system of record has to be connected before the first item can be recorded, and that connection is where projects stall.
V Labs tested a different order of operations. The operator photographs the item, photographs its identifying label, and then photographs the customer's existing serial or license plate. The platform returns a complete record keyed to the customer's own identifier, and the customer updates its own system from that record.
The result is a deployment with no integration on day one. The integration, if it is wanted later, is a convenience rather than a prerequisite. The test was run with an operating customer and the approach is now in production use.